After the roof is erected, it will be covered. Inside the building, structures for drywall partitions are beginning to appear, and the first installed windows can be seen in the openings. Scaffolding is being erected around the building.

June 2022
June 2022
June 2022
June 2022
June 2022
June 2022
June 2022
June 2022
June 2022
June 2022
June 2022
June 2022
June 2022
June 2022
June 2022